Our latest, two week turnaround.
We’ve just had a fortnight in Grasscroft, where we removed a budget kitchen and replaced it with something much prettier, of better quality, and a far superior design.
We lowered the ceiling to cut heating costs, altered wiring, tidied the plumbing, complete replaster, and do what we always do; seal the floor board perimeter to cut down massively on draughts, too. We also fitted a new plinth heater and relocated the radiator, so the fridge door wouldn’t clash.